Working with the Frame Damage Worksheet
The Frame Damage Worksheet feature creates a frame diagram and has fields where you can enter dimensional corrections and repair hours, (including set-up hours). CCC ONE automatically calculates the labor cost. You can also enter a note, and add the labor costs to the top or the bottom of the estimate.
- Open the workfile.
- Select the Estimate tab, and then select the Lines tab.
- Select the MOTOR tab.
- Select the Frame > Frame Sheet from the Operations toolbar. The Frame Damage screen opens.
- Enter the frame labor information in the screen.
- Select Insert to Top of Estimate or Append to Estimate to add the line entry to the estimate.
- Select Save or Save and Close to save the information in the workfile.